Lumber Plant Dryer Pipes & Cyclones
The major project at an Alberta lumber plant involved replacing all dryer pipes and a total of 7 cyclones.
The major project at an Alberta lumber plant involved replacing all dryer pipes and a total of 7 cyclones.
The client had a specific fume issue they wanted to solve at their mechanical shop in Red Deer, Alberta.
VETS supplied and installed a HVAC system in a series of mods for a mine.
VETS engineered, manufactured and installed the dust collection system for an OSB (Oriented Strand Board) Mill.
The success of upgrading or implementing a dust control strategy in any facility starts with an efficient design, followed by craftsman-quality fabrication and expert installation, all the while recognizing that ‘the devil’s in the details’.
Simply having a dust collection system installed is not enough to ensure a safe and efficient facility forever. Dust collection system assessments are recommended to ensure your system and its components are working as intended.
Implementing dust control in your facility should include regular maintenance and inspections to ensure less wear and tear on your system.
We would love to hear from you!
Complete the form so we have a better idea of how best to serve your needs. A representative will be in touch within 24 hours.
* All fields are required
24 HR Phone: 780.434.7476
Phone: 780.434.7476
General Inquiries: info@vetsgroup.com
Careers: hr@vetsgroup.com